Monday, July 18, 2011

House progress (Master bath tile & Built-ins)

Here are some pictures I took of the house last week. The tile work is all done, but the master still needs to be grouted. The trim work is almost all done and they are currently building all the built-ins.
Here are the beginning stages of the built ins on either side of the fireplace. The bottom will have cabinet doors and the top will have a nice arch with adjustable shelves.
This is still unfinished, but you get the idea. There will be 4 cubbies and hooks for jackets below that. The bench has 2 storage bins to hide things :)
Here is our master tub area...I love how this turned out. It still needs to be grouted.
Here is the master shower, also still needs to be grouted and we need to still install the glass door and glass wall.

No comments: